I am pretty sure this is my last post. This forum has turned into something that it shouldn't be. When someone "claims" someone died, that is very serious and I don't take it likely. I am not going into detail and go back and forth with someone I don't even know. I will state this for the last time, A crane did not tip over on a barge during the demo of the Cooper River Bridges. It's been real ,,,,,,,,,,,,argue among yourselves!!!!!!!!!!!
Be safe,
DemoBoss
I am just responding to the statement about checking my facts and that certain things didn't happen.
I have nothing against Testa, what I have a problem with is someone questioning or implying that I was lying, it would have ended there. Instead he said it didn't so I had to provide a little proof of who was telling the truth and who wasn't.
If I were so inclined crane incidents at a certain shipyard and the FBI would have been included in the above.
As far as glass houses, our company spends countless hours and money on safety training, bonuses, etc trying to keep us from having OSHA incidents. Just this year we have been on 4-VPP OSHA sites. The only way that is possible is to not have 1 single OSHA violation in the last 5 years. I am also not out there doing promotion telling everyone how big and bad we are, touting videos, etc.
And yes Demco has Yankee stadium. As I said before there was no-way that a boston contractor was going to have any part in the House that Ruth Built.
Or was it this OSHA incident in SC? Are you sure you were there? Because believe me I can keep posting the issues that Testa has had in MA, SC, etc, etc when you want to call in what I do and don't know.
Inspection: 301117941 - J Cashman Constructors Testa Corp A Joint Venture
Inspection Information - Office: Columbia
Nr: 301117941 Report ID:0418500 Open Date: 11/29/2005
J Cashman Constructors Testa Corp A Joint Venture
222 Huger St.
Charleston, SC 29403 Union Status: NonUnion
SIC: 1622/Bridge, Tunnel, and Elevated Highway Construction
NAICS: 237310/ Highway, Street, and Bridge Construction
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Health Close Conference: 12/01/2005
Planning Guide: Health-Construction Close Case: 06/22/2006
Optional Information: Type ID Value
N 1 301117941
N 6 666666
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations
2
2
Current Violations
Inspection: 301117875 - J Cashman Constructors Testa Corp A Joint Venture
Inspection Information - Office: Columbia
Nr: 301117875 Report ID:0418500 Open Date: 11/29/2005
J Cashman Constructors Testa Corp A Joint Venture
222 Huger St.
Charleston, SC 29403 Union Status: NonUnion
SIC: 1622/Bridge, Tunnel, and Elevated Highway Construction
NAICS: 237310/ Highway, Street, and Bridge Construction
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/02/2005
Planning Guide: Safety-Construction Close Case: 02/24/2006
Optional Information: Type ID Value
N 1 301117875
N 6 666666
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 2
6
8
Current Violations 2
6
8
Initial Penalty 1750
1750
Current Penalty 1750
1750
FTA Amount
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Serious 19260550 F01 IV 01/19/2006 01/24/2006 $875 $875 $0 -
2. 01002A Serious 19261053 A11 01/19/2006 02/14/2006 $875 $875 $0 -
3. 01002B Serious 19261053 B17 01/19/2006 01/31/2006 $0 $0 $0 -
4. 02001 Other 19260050 D01 01/19/2006 01/24/2006 $0 $0 $0 -
5. 02002 Other 19260152 G11 01/19/2006 01/24/2006 $0 $0 $0 -
6. 02003 Other 19260501 B04 II 01/19/2006 01/24/2006 $0 $0 $0 -
7. 02004 Other 19260550 A14 I 01/19/2006 01/24/2006 $0 $0 $0 -
8. 02005 Other 19260600 A05 01/19/2006 01/31/2006 $0 $0 $0 -
9. 02006 Other 19260605 D02 01/19/2006 01/24/2006 $0 $0 $0 -
2
2
Initial Penalty
Current Penalty
FTA Amount
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 01001 Other 19100134 C01 05/09/2006 06/05/2006 $0 $0 $0 -
2. 01002 Other 19100141 D02 II 05/09/2006 05/17/2006 $0 $0 $0 -
--------------------------------------------------------------------------------
Inspection: 309055754 - J. Cashman, Inc./Testa Corp-Joint Venture
Inspection Information - Office: South Carolina Priv
Nr: 309055754 Report ID:0454510 Open Date: 11/29/2005
J. Cashman, Inc./Testa Corp-Joint Venture
Hwy 17 (Pearman Bridge)
Charleston, SC 29403 Union Status: NonUnion
SIC: 1622/Bridge, Tunnel, and Elevated Highway Construction
NAICS: 237310/ Highway, Street, and Bridge Construction
Mailing: 222 Huger Street, Charleston, SC 29403
Inspection Type: Planned
Scope: Complete Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 12/19/2005
Planning Guide: Safety-Construction Close Case: 04/18/2006
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 4
3
7
Current Violations 2
3
5
Initial Penalty 2190
2190
Current Penalty 540
540
FTA Amount
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
1. 03001 Serious 19260028 A 01/06/2006 01/11/2006 $300 $750 $0 I - Informal Settlement
Deleted 2. 03002 Serious 19260404 B01 I 01/06/2006 01/11/2006 $600 $600 $0 I - Informal Settlement
Deleted 3. 03003 Serious 19260404 F07 IVC2 01/06/2006 01/11/2006 $600 $600 $0 I - Informal Settlement
4. 03004A Serious 19260404 B01 I 01/06/2006 01/11/2006 $240 $240 $0 I - Informal Settlement
5. 03004B Serious 19260404 F07 IVC2 01/06/2006 01/11/2006 $0 $0 $0 I - Informal Settlement
6. 04001 Other 19101200 F05 01/06/2006 01/12/2006 $0 $0 $0 I - Informal Settlement
7. 04002 Other 19260152 G09 01/06/2006 01/12/2006 $0 $0 $0 I - Informal Settlement
8. 04003 Other 19260602 A09 I 01/06/2006 01/12/2006 $0 $0 $0 I - Informal Settlement
According to this OSHA log there was a pretty big crane accident
Inspection: 309052272 - J. Cashman, Inc./Testa Corp-Joint Venture
Inspection Information - Office: South Carolina Priv
Nr: 309052272 Report ID:0454510 Open Date: 08/24/2005
J. Cashman, Inc./Testa Corp-Joint Venture
Hwy 17 (Pearman Bridge)
Charleston, SC 29403 Union Status: NonUnion
SIC: 1622/Bridge, Tunnel, and Elevated Highway Construction
NAICS: 237310/ Highway, Street, and Bridge Construction
Mailing: 222 Huger Street, Charleston, SC 29403
Inspection Type: Accident
Scope: Partial Advanced Notice: N
Ownership: Private
Safety/Health: Safety Close Conference: 10/03/2005
Planning Guide: Safety-Construction Close Case: 01/13/2006
Optional Information: Type ID Value
N 10 IMMLANG-N
Related Activity: Type ID Safety Health
Accident 100376102
Violation Summary
Serious Willful Repeat Other Unclass Total
Initial Violations 8
1
9
Current Violations 2
1
3
Initial Penalty 10550
10550
Current Penalty 1550
1550
FTA Amount
Violation Items
# ID Type Standard Issuance Abate Curr$ Init$ Fta$ Contest LastEvent
Deleted 1. 01001 Serious 19260021 B02 10/12/2005 10/18/2005 $2500 $2500 $0 I - Informal Settlement
Deleted 2. 01002 Serious 19260501 A02 10/12/2005 10/17/2005 $3000 $3000 $0 I - Informal Settlement
Deleted 3. 01003 Serious 19260501 B01 10/12/2005 10/18/2005 $875 $875 $0 I - Informal Settlement
Deleted 4. 01004 Serious 19260502 D16 10/12/2005 10/18/2005 $875 $875 $0 I - Informal Settlement
Deleted 5. 01005 Serious 19260503 A01 10/12/2005 11/14/2005 $875 $875 $0 I - Informal Settlement
Deleted 6. 01006 Serious 19260503 A02 10/12/2005 11/14/2005 $875 $875 $0 I - Informal Settlement
7. 01007A Serious 19260021 B02 10/12/2005 10/18/2005 $1200 $1200 $0 I - Informal Settlement
8. 01007B Serious 19260501 A02 10/12/2005 10/17/2005 $0 $0 $0 I - Informal Settlement
9. 01008A Serious 19260501 B01 10/12/2005 10/18/2005 $350 $350 $0 I - Informal Settlement
10. 01008B Serious 19260502 D16 10/12/2005 10/18/2005 $0 $0 $0 I - Informal Settlement
11. 01008C Serious 19260503 A01 10/12/2005 11/14/2005 $0 $0 $0 I - Informal Settlement
12. 01008D Serious 19260503 A02 10/12/2005 11/14/2005 $0 $0 $0 I - Informal Settlement
13. 02001 Other 19260503 B01 10/12/2005 11/14/2005 $0 $0 $0 I - Informal Settlement
demoman518;11290 said:
Isn't that the bridge where the crane operator working on the barge flipped over and died?And wasn't that a joint venture between Testa and another contractor?
I worked on that project and a crane never even had an accident down there.Get your facts straight before you make a statement like that, please.
Engineer, good answer, I am a superitendant with Testa Corp and you have only hit the tip of the IceBurg.I have know idea who Connie is, and with her attitude don't really care. I am writing about Yankee Stadium.
I read todays New York Daily News March24. An article stated why the contract and permits have not yet been finalized, A spokes person for the City office of Capital Project Development stated, "Contractor solicitation cannot begin too far in advance of an estimated work start date because contractors don't hold prices indefinitely and you run the risk of having to rebid the contract". He further stated,"the process began,"well before the team moved out".
Having read this it tells me, the bids are still in review.
Connie28 who told you testa got run out of boston you have no clue what your talkin about, work dried up and to stay as big as they are they had to look else where.. The jobs in NYC are peanuts compared to the 60 million dollar bridge demo in Charleston SC and the Big Dig... Unbuilding (demolition) of the Grace and Pearman Bridges in Charleston (the old Cooper River Bridges) check out that link bridge in SC
5:16 PM
Couldn't find anything on the internet confirming or denying Demco has the job. Curious to know what the final resolution is.
I did, however, come across this neat old photo of the Ebbetts Field demolition. Guess this is about 1960 or so--almost 50 years ago. They decorated the wrecking ball like a baseball, and Roy Campanella is watching from a wheelchair, almost in tears, in one old film.
I can confirm that Spiritas has bonding problems because when they were the low bidder at Shea they tried to do a joint venture with us to provide the bond.
The only problem we had is that if we were bonding and doing 1/2 the work we wanted fair compensation and they wanted a 50/50 deal.
Also Mr Spirtas didn't want to personally put anything on the line which was a requirement from our bonding company. They were involved with AT Milestone Environmental which does interior demolition and abatement in the tri-state area. They did a $760,000 abatement for us in GA but basically subbed the entire project to a MBE.
Most Users Ever Online: 429
Currently Online:
85 Guest(s)
Currently Browsing this Page:
2 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030