Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
R. Baker & Son All Industrial Services Makes Quick Work of Fast Food Modular Project
June 16, 2008
6:24 AM
Avatar
Member
Forum Posts: 46
Member Since:
April 3, 2008
sp_UserOfflineSmall Offline

R. Baker and Son All Industrial Services, an expert rigging, machinery moving, demolition and equipment relocation contractor recently completed the rigging of two modular boxes for a Checkers in Staten Island, NY.

The scope of work for the project consisted of rigging two modular units that would make up a new Checkers in Staten Island, NY. The entire facility was delivered to the site as two modular units. The modular units were 25 x 37 x 12 feet in dimension, contained all the necessary restaurant equipment and were pre-wired. R. Baker & Son was tasked with carefully rigging these modular units from the transports onto a pre poured concrete foundation.

Rigging of these units was difficult due to an offset center of gravity caused by the way equipment and utilities were installed in these modular units. A rigging plan was developed to safely address the weights, sizes and center of gravity of these units. Once the in house engineering staff approved the rigging plan, the rigging crews were mobilized to the site to perform the work.

The work needed to be completed in one (1) day in order to maintain project schedule for the client. In order to complete this fast track scope of work, R. Baker and Son utilized a 120 ton hydraulic crane along with a four (4) man rigging crew. Management expertly coordinated the arrival of the transports with the efforts of the rigging crew and crane.

All modular units were safely rigged into their final positions without incident or damage. The client was extremely pleased with the rigging efforts and that the work was completed on schedule.

For more information on R. Baker & Son

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
64 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar