8:17 AM
February 24, 2013
San Diego Unified Port District: DEMOLITION AND SITE IMPROVEMENTS TRANSIT SHED 1 AT TENTH AVENUE MARINE TERMINAL. Work to be done shall be according to Drawing No. TA-2017-01 and Specification No. 2017-03R of the San Diego Unified Port District and shall include: Hazardous Materials Abatement (Primarily Asbestos and Lead Based Paint), Structural Deconstruction; Demolition and Removal of Transit Shed No. 1, Bays A, B & C, adjacent Metal Shed, and Loading Dock; Recycling or legal disposal of all demolished materials; Crushing of Building Concrete Walls and Foundation to be used as Base Material; Excavation Unclassified Soil Material and placing and grading Soil Material at District Facility in Chula Vista; Water, sewer, and Electrical abandonment; Electrical Utility Service Upgrades, including 90 foot Mast Lighting, Fire Protection System, Storm Water Conveyance and quality BMP Improvements, and Site Paving; CCTV Camera Installation , Prefabricated Modular Restroom/Office Building and all other incidental items of Work as shown and specified. Work also includes installation of Modular Office Facility Site Improvements by the Main Gate including Site Grading, Retaining Walls, Water, Sewer, Electrical Services, Storm Water Conveyance and Quality BMP Improvements, and all other incidental items of Work as shown and specified. The total contract duration is 400 calendar days. The Engineers Construction estimate for this work is $13,000,000.00.
Most Users Ever Online: 429
Currently Online:
63 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030