Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
Plaster Silica Removal Project Completed by The Mack Group, LLC
March 10, 2009
6:00 PM
Avatar
Member
Forum Posts: 26
Member Since:
March 7, 2008
sp_UserOfflineSmall Offline

The MACK Group, LLC Completes Plaster Silica Removal within Active Laboratory Facility

The MACK Group, LLC, a premier asbestos abatement, mold, lead, biological, chemical and demolition contractor recently completed the removal of plaster silica ceiling and walls within an active laboratory facility in New Jersey.

A large Fortune 500 pharmaceutical client needed 15,000 square feet of former laboratory space demolished to make way for new operations. The area contained old plaster silica ceilings and walls and needed to be demolished without any dust emissions and so as not to disturb the adjacent active laboratory operations.

To accomplish this project within the client

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
83 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar