Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
New delay for Fiterman demolition
July 7, 2006
10:39 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]BThe demolition of a 9/11-contaminated building faced another setback last week as officials rejected demolition bids from four contractors. [/FONT]
[FONT=Verdana][/FONT]
[FONT=Verdana]Fiterman Hall, a Borough of Manhattan Community College building on W. Broadway, has stood damaged and contaminated since the World Trade Center attacks on Sept. 11, 2001. After reviewing bids to clean and demolish the 15-story structure, the State Dormitory Authority rejected them all, sending the contractors back to the drawing board.[/FONT]
[FONT=Verdana][/FONT]
[FONT=Verdana]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
80 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar