




















Gramercy Group, Inc. (gramercygroupinc.com) completed primary demolition of Giants Stadium in East Rutherford, NJ at the Meadowlands Complex
on Monday, June 28th, 2010 with the Final Down of the South West Radius at Gate C.
At approximately 2:24 PM under partly cloudy skies the 6 tier radius section adjacent to the pedestrian helix was pulled down successfully by 3 heavy Komatsu Gramercy excavators.
Views include remote cameras placed on one of the support columns, to the left of the structure on the ground about 50 yards away, in front of the falling structure about 75 yards away
and inside the structure mounted in the DEMO-CUBE (tm). A custom designed and welded demolition proof camera enclosure.
An additional camera shooting from the left side captured the pull down at 210 frames per second in super slow motion.
Most Users Ever Online: 429
Currently Online: John
34 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3014
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20279
Posts: 27945
Newest Members:
christianaantigaAdministrators: JOHN: 7602, John: 7370