Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
Demolition starts on Mill Creek dam
June 11, 2008
8:13 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]Construction workers chipped away at a century of history in downtown Dexter, MI as they began tearing out the dam on Mill Creek. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]A large construction machine was driven out into Mill Creek around 8 a.m. and its operator began slamming a large metal rod into the concrete at the top of the dam, which is under the Main Street bridge. As a small group of city officials and onlookers stood on the creek bank nearby, the machine punched out pieces of the structure, turning the dams once well-defined straight line of concrete and steel into a pock-marked, irregular surface. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]The water level in the pond created by the dam appeared to drop a bit as water flowed through the holes punched in the top of the dam. After a little more than an hour, construction workers ended the demolition for the day. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]The ET MacKenzie Co. of Ann Arbor will remove about 12 to 18 inches of the concrete barrier one day each week through mid-July with its large, bright yellow CAT excavator with a demolition hammer on the end. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]The dam, which has held back the Mill Creek pond for 98 years, was built in 1910 and reinforced with concrete and stone in 1932, said Aaron Berkholz, project engineer for the Washtenaw County Road Commission. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]"So far, it's going smoothly,'' he said of the first phase of the dam removal process. [/FONT]
[FONT=Verdana] [/FONT]
[FONT=Verdana]The removal of the 9-foot-high dam required months of preparation and multiple permits from the state Department of Environmental Quality and is part of the $3.3 million Main Street bridge replacement project. Removal of the dam itself is costing about $40,000, said Donna Dettling, Dexter Village manager. [/FONT]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
65 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar