Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
Demolition on three buildings at the Hotel Sterling
August 3, 2006
4:19 PM
Avatar
Wolf
Guest

What an awesome demo. Here's a picture of what's going on.

August 3, 2006
10:42 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

Workers with Brandenburg Demolition Services already have gutted the buildings, removing 700 tons of carpeting, drywall and other debris in preparation of the demolition. The demolition will occur over the next 12 to 14 weeks leaving a flat, vacant lot where a 14-story building, a four-story connector building and the Tower Building currently stand.

The hotel complex is owned by CityVest, a non-profit agency. When the agency began seeking bids to tear down the buildings in 2005, experts advised that implosion was the most cost-effective method. When the bids came in, however, Brandenburg, which was the lowest responsible bidder at $2.9 million, recommended demolition over implosion.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
71 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar