Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
Demolition of Statesman Towers Starts
sp_BlogLink Read the original blog post
April 14, 2015
6:54 AM
Avatar
Member
Forum Posts: 57
Member Since:
February 24, 2013
sp_UserOfflineSmall Offline

Demolition of the Statesman Towers on the campus of Indiana State University has begun.

The first hit of the wrecking ball to the East Tower started at 11 a.m. These towers, built in the late 1960’s, were originally used as residence halls and then later as the Schools of Education and Business.

Even though the first hit didn’t take place until Monday, crews have been at the scene since February trying to recycle as much as possible. The total demolition will taken an estimated four to five months with the majority of that time spent removing debris.

“We want to do as much recycling on this project as possible,” said Bryan Duncan, Director of Capital Planning and Improvement. “It’s not a huge footprint from the towers, but it’ll become green space between two existing parking lots.”

The total cost for this project will be about $1.9 Million.

Renascent, Inc. based in Indianapolis is doing the demolition

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
95 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar