Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
Demolition Begins On Portneuf Hospital for Expansion Project
June 16, 2006
9:58 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]In Pocatello ID wrecking crews and their heavy machinery took the first bite out of the hospital's east campus building shortly after 9 a.m. The building had already been isolated from the rest of the east wing and stripped of power connections. Before the heavy hitters came in, crews even had to haul away small amounts of asbestos.

It was all part of a project that will eventually mean better health care for the region, and it is good for Pocatello. Brennan will eventually employ about 500 construction workers on the project.

This is phase one of six. It will take about 18 months to complete this phase, and it will be 8 to 10 years before all six phases are finished.

In that building

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
73 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar