

Alhambra USD: CHURCH DEMOLITION PROJECT. The Project consists of all labor, materials, equipment, and services necessary to demolish and remove from site all structures (above and below ground, basement) and materials as stipulated and implied in the contract documents. Includes backfilling approximately 920 cubic yards of soil stockpiled on site, allowance for disposing items at the Construction Office, and installing a permanent 6’-0”H, 2” mesh chainlink fence around the perimeter of the site with (2) 8’-0” wide driveway swing-gates and (1) 3’-0” wide pedestrian gate with blue windscreen.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
25 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3013
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20299
Posts: 27965
Newest Members:
Froilan BalagtasAdministrators: JOHN: 7602, John: 7390