Avatar

Please consider registering
guest

sp_LogInOut Log In sp_MemberList Members

Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

The forums are currently locked and only available for read only access
This topic is locked This forum is locked
sp_Feed Topic RSS sp_TopicIcon
WI - HATLEY: VENEER MILL DEMOLITION:
January 7, 2018
8:58 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

HATLEY: VENEER MILL DEMOLITION: The work for which bids are asked includes the following approximate quantities: removal and disposal of asbestos containing materials plus regulated wastes, demolition of existing buildings and pavements covering approximately 1.42 acres including removal of subsurface foundations and related structures plus removal of existing at-grade structures such as slabs and related features. The work also includes hauling and disposal of demolition materials, site grading, backfill and compaction to restore the site to a uniform ground surface profile, plus related work including unclassified excavation, trucking, erosion control,site cleanup/restoration, and related miscellaneous construction

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

This topic is locked This forum is locked
Forum Timezone: America/New_York

Most Users Ever Online: 312

Currently Online:
41 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 533

Member Stats:

Guest Posters: 48

Members: 2573

Moderators: 0

Admins: 4

Forum Stats:

Groups: 4

Forums: 17

Topics: 13857

Posts: 22088