Avatar

Please consider registering
guest

sp_LogInOut Log In

Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

The forums are currently locked and only available for read only access
This topic is locked
sp_Feed Topic RSS sp_TopicIcon
WI - Appleton: PROJECT BLUE RAMP DECONSTRUCTION
August 5, 2018
9:33 AM
Avatar
John
Admin
Forum Posts: 522
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Appleton: PROJECT BLUE RAMP DECONSTRUCTION: The project is for the deconstruction of the City of Appleton Blue Ramp located at 120 N. Appleton Street and 115 W.Washington Street, Wisconsin 54911. The City of Appleton is planning on deconstructing the Blue ramp in downtown Appleton in 2019. Prior to deconstruction; businesses at 124 N. Appleton Street and 115 W. Washington street will need to vacate their facilities. Existing utilities to the buildings will need to be disconnected and mixed utility services to remaining adjacent buildings will need to be modified. Once the Blue ramp is deconstructed the site is to be restored to a green space. The facades of the adjacent remaining structures are to be refurbished.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

This topic is locked
Forum Timezone: America/New_York

Most Users Ever Online: 312

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 533

Member Stats:

Guest Posters: 47

Members: 2600

Moderators: 0

Admins: 4

Forum Stats:

Groups: 4

Forums: 17

Topics: 13537

Posts: 21773

Newest Members:

chrishates17, Ybnneez, Nicholas aguila, Gfries28@gmail.com, Bboyd3208

Administrators: JOHN: 7602, John: 522, Jeff Shaikh: 0, Jonathan Bernardi: 0