Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME - Portland: demolition of on-Site buildings, foundations, utilities, and on-Site features/infrastructure
September 20, 2020
8:50 AM
Avatar
Admin
Forum Posts: 6249
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Ransom Consulting: Brownfields Cleanup of Phase I Construction for the Front Street Apartments Portland Maine. Ransom Consulting, LLC (Ransom), on behalf of the Portland Housing Authority (PHA), will receive bids for Phase I of the cleanup of the Front Street Apartment Site, located at 37 Front Street in Portland, Maine. The work generally consists of the following tasks: Abatement of asbestos and other hazardous building materials present within the Site buildings in accordance with applicable local and state regulations; demolition of on-Site buildings, foundations, utilities, and on-Site features/infrastructure; stormwater and groundwater management during construction; sewer system modifications; excavation, Site re-grading, and backfill; transportation and off-site disposal of excess soils; installation of a soil cover system; and Site restoration.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
30 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3037

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19252

Posts: 27485

Administrators: JOHN: 7602, John: 6249