Avatar

Please consider registering
guest

sp_LogInOut Log In

Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

The forums are currently locked and only available for read only access
This topic is locked
sp_Feed Topic RSS sp_TopicIcon
FL - Davie: demolish existing Pier’s #’s 4, 6, 8 & 11
January 7, 2018
9:18 AM
Avatar
JOHN
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Town of Davie: Linear Park Piers Projects. furnish all labor and tools necessary to obtain necessary building permits and demolish existing Pier’s #’s 4, 6, 8 & 11. The piers are located along the C-11 canal on Orange Drive (see site plans for details). Completely remove all Pier elements, including existing piles, deck,railings and connector ramp. Supply, deliver and install all necessary materials to construct new pier’s per the attached drawings and specifications. Contractor will leave existing piles and add four (4) new piles per attached drawings. Reference drawings attached. Bid price shall include all associated costs to complete the project including but limited to all mobilization, Maintenance of Traffic (M.O.T.), labor, materials, equipment, supervision, transportation, fuel, overhead, profit and insurance.

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

This topic is locked
Forum Timezone: America/New_York

Most Users Ever Online: 312

Currently Online:
25 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Wolf: 649

Robert Kulinski: 573

1Pyro: 548

Member Stats:

Guest Posters: 38

Members: 2960

Moderators: 0

Admins: 4

Forum Stats:

Groups: 4

Forums: 17

Topics: 13375

Posts: 21743

Newest Members:

NikolayBug, jprinz123, Andrey GolubWEM

Administrators: JOHN: 7602, John: 340, Jeff Shaikh: 0, Jonathan Bernardi: 0