Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Demolition Of Altitude Wind Tunnel
July 19, 2006
9:08 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]NASA/GRC plans to issue a Request for Proposal for demolition of the Altitude Wind Tunnel at GRC. The demolition includes the structure and concrete piers and foundations. Relocation of active piping utilities and installation of a new electrical transformer. The order of magnitude for the procurement is $3.5 M and the effort shall be completed within 300 calendar days after notice to proceed. The NAICS Code and small business size standard for this procurement are 238910 and $13M, respectively. The procurement will be conducted under full and open competition. The anticipated release date of the RFP is on or about August 1, 2006 with an anticipated offer closing date of on or about august 31, 2006. The firm date for receipt of proposals will be stated in the RFP. Drawings will be available from a local vendor. All responsible sources may submit an offer which shall be considered by the agency. An ombudsman has been appointed -- See NASA Specific Note "B". The solicitation and any documents related to this procurement [with the exception of the drawings] will be available over the Internet. These documents will reside on a World-Wide Web (WWW) server, which may be accessed using a WWW browser application. The Internet site, or URL, for the NASA/GRC Business Opportunities page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=22 Prospective offerors shall notify this office of their intent to submit an offer. It is the offeror's responsibility to monitor the Internet site for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any). Any referenced notes may be viewed at the URLs linked below. FAR 52.236-27 Site Visit (Construction) (Feb 1995) Alternate I (Feb 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of the solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for - TBD (c) Participants will meet at- Main Gate 9:00AM (End of Provision) All contractual and technical questions must be submitted in writing. Telephone questions will not be accepted.[/FONT]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
28 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19312

Posts: 27546

Administrators: JOHN: 7602, John: 6309

Skip to toolbar