Weaver High School: Phase 3 of 6- abatement and demolition at the existing Field House, 415 Granby Street Hartford, CT 06112 The Hartford School Building Committee (HSBC) through the Construction Manager, Newfield + Downes Joint Venture invites interested and qualified parties to submit a bid based on the requirements contained in the Bid Documents for the Weaver High School Project, 415 Granby Street, Hartford, CT 06112. The work consists of abatement and demolition at the existing Field House. Newfield + Downes Joint Venture is seeking qualified bidders for the following bid packages: 3.1 Demolition (PLA)* 3.2 Selective Demolition (SA) 3.3 Mercury Abatement (SA) 3.4 Abatement (SA) 3.5 Concrete (PLA)* 3.6 Foundation Excavation (SA) 3.7 Temp Electric (SA/PLA) Bid Packages Designations: (SA)
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online: John
49 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 48
Members: 3037
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19252
Posts: 27485
Administrators: JOHN: 7602, John: 6249