Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Asbestos Abatement - Olathe, Kansas
June 23, 2006
9:33 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[FONT=Verdana]Project includes asbestos abatement; and upgrading the lighting, fire protection and building finishes in the Administrative Wing of the Air Route Traffic Control Center in Olathe, KS. The scope of work includes, but is not limited to, the following: 1) Remove and dispose of all friable and non-friable asbestos containing material (ACM), and lead in accordance with all local, state and federal regulations. 2) ACM removal shall include but is not limited to the carpet, floor-tile and mastic, vestibule ceiling, mechanical duct and insulation, and fan coil pipe and insulation. The mastic on the fan coil pipes and duct insulation shall be treated as ACM. 3) Remove the Polychlorinated Biphenylis (PCBs) light ballast and fluorescent lamps and turn them over to the FAA Facility Environmental and Safety Specialist for disposal. This contractor shall coordinate the disposal with the COTR/RE. 4) Remove and dispose of the existing metal partition wall systems, utility chase wall, suspended ceiling, doors, fan coil units, piping, electrical conduit, electrical outlets, electrical circuits, light fixtures, and plumbing. 5) Furnish and install new wall systems, doors and frames, suspended ceiling, light fixtures, floor and wall tile, electrical conduit, electrical outlets, electrical circuits, and carpet. 6) Furnish and install new halogen lights. 7) Furnish and install a wet-pipe sprinkler system. 8) Furnish and install the items needed to relocate the existing addressable fire alarm system components. 9) Furnish and install a 2-pipe system for the fan coil units on the first and second floor of the office area portion of the administrative wing; and a 4-pipe system for the fan coil units in the cafeteria. 10) Furnish and install plumbing between the basement and the first floor restrooms. 11) Furnish and install ductwork and accessories for the basement and first floor. 12) Fire stop penetrations generated during the construction of the project. FULL AND OPEN COMPETITION RANGE: $250,000 to $600,000 NAICS: 238190 To be placed on the mailing list, please submit a request via e-mail to [email]sariah.ctr.pinick@faa.gov[/email] or fax to 816-329-3137. The request must include the company name, point of contact, address, phone number and fax. This Notice is for informational purposes for Minority, Women-Owned and Disadvantaged Business Enterprises: The Department of Transportation (DOT), Office of Small and Disadvantaged Business Utilization, has programs to assist small businesses, small businesses owned and controlled by a socially and economically disadvantaged individuals, and women-owned concerns to acquire capital and bonding assistance for transportation-related contracts. This is applicable to any eligible prime or subcontract at any tier. The DOT Bonding Assistance Program enables firms to apply for bid, payment, and performance bonds up to $1.0 million per contract. The DOT provides an 80 percent guaranty on the bond amount to a surety against losses. Loans are also available under the DOT short Term receivable financing. The maximum line of credit is $750,000. For further information regarding the bonding and lending programs please call the DOT Office of Small and Disadvantaged Business Utilization at (800) 532-1169.[/FONT]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
40 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3037

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19252

Posts: 27485

Administrators: JOHN: 7602, John: 6249