Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_TopicIcon
What is happening here?
July 4, 2011
9:49 AM
Avatar
Member
Forum Posts: 5
Member Since:
November 4, 2010
sp_UserOfflineSmall Offline

looks to me like they are installing tie backs or slope nailing. Used to stabilize the wall.

June 27, 2011
1:36 PM
Avatar
Member
Forum Posts: 3
Member Since:
June 27, 2011
sp_UserOfflineSmall Offline

also, in the industry, about how long after domo is complete does the new construction begin?

June 27, 2011
1:32 PM
Avatar
Member
Forum Posts: 3
Member Since:
June 27, 2011
sp_UserOfflineSmall Offline

what are the things coming out of the holes?

[ATTACH]667[/ATTACH]

June 27, 2011
12:50 PM
Avatar
Member
Forum Posts: 198
Member Since:
December 29, 2005
sp_UserOfflineSmall Offline

Looks like holes drilled for drainage. Allows water to pass through the wall from the hill behind it.

June 27, 2011
12:19 PM
Avatar
Member
Forum Posts: 3
Member Since:
June 27, 2011
sp_UserOfflineSmall Offline

Hey, so im not in the demo industry, but this is happening next door, and im wondering what it means.

are they about to make that wall go boom with some tnt?

Any tips on what the holes are for and the aftermath of it would be great.

Thanks Demolition Forum!

[ATTACH]666[/ATTACH]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
39 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 48

Members: 3037

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19252

Posts: 27485

Administrators: JOHN: 7602, John: 6249